NESTON RECREATION CENTRE

Neston Recreation Centre 

Client: Kier Construction

Value: £720,000.00

Program: 28 weeks

AJ Field was appointed to replace the existing ageing Mechanical and Electrical services with new services at Neston Recreation Centre. Not only did this provide an energy efficient building, it also allowed the centre to offer sports facilities for the local community, as well as offering physical education facilities to the school which shares the same site.

The centre is fed from a district heating system located in the adjacent school, with a new automatic control system being utilised to fully integrate the new systems to work alongside the existing installation. The latest VRF air conditioning and ventilation system were installed to allow the architectural team to achieve their open plan design and provide a state of the art gym.

Services provided:

  • District Heating System
  • BMS Automatic Controls
  • Swimming Pool Life Safety Systems
  • Access Control
  • Mains Distribution 
  • Fire Alarm System
  • Security Alarm System
  • Closed Circuit Television
  • Structured Data Wiring and Telecoms 
  • General and Emergency Lighting
  • Domestic Water Services
  • Mechanical Ventilation
  • Air Conditioning
  • Lightning Protection System

Back